Leveraging Employee Experience in the Design-Construction Industry

Andrea Alonso, Human Resources Director, Beck Group Mexico

The New Architecture of Construction Careers

Stephen Hunt, Director, Corporate Talent Development, Jacobsen Construction

Overcoming Barriers and Enhancing Data Sharing in Construction

Anil Sawhney, Ph.D. PMP FHEA FRICS, Head of Sustainability at RICS

Advancements In Construction

Talin Astourian Espinoza, Vice President, Business Development, Flatiron Construction

A featured contribution from Leadership Perspectives: a curated forum reserved for leaders nominated by our subscribers and vetted by the Construction Tech Review Advisory Board.

,

Kpmg Builds With Innovation To Inspire Creativity And Learning

Kpmg Builds With Innovation To Inspire Creativity And LearningFred Battista, Senior Vice President, JLL And Bill Flemming, Managing Director Of Real Estate Services, KPMG

When KPMG set out to create a state-of-the-art learning, development and training environ­ment, it envisioned far more than just class­rooms. Rather, the goal was to create an engag­ing, energizing experience to inspire innovation and human performance in preparation for the future of work.

The result? The $450 million KPMG Lakehouse learning and innovation center, a 55-acre campus comprising not only conference and training facilities, but also 800 guest rooms, fitness and outdoor recreational facilities, and multiple food and beverage venues. To foster collaboration and innovation, the campus provides a rich multi-sensory experience and sense of discovery drawn from the natural environment—think human-scale curving halls and walkways; natural daylight and views; and varied spaces.

Headquartered out of Chicago, and known as one of the Big Four auditors, KPMG constructed its new center on a 55-acre campus in Lake Nona, Florida. The new facility expands KPMG’s training capabilities for staff and clients and is slated to open in early 2020.

As visitors experience the center’s multifaceted classrooms and amenities, what they won’t see are the innovative construction strategies used to develop the world-class facility on a rapid and compressed time schedule.

 To develop the complex project as efficiently as possible, KPMG assembled a team comprising JLL Project and Development Services, DPR Construction and Gensler, a design and architecture company.

One creative strategy was to manufacture key energy infrastructure components offsite, rather than constructing the components onsite after the building shell was complete. For instance, the electrical equipment—including switchgear, switchboards, panel boards and transformers—was assembled on a single skid and tested before delivery to the site. Once delivered, the only remaining tasks were to connect the incoming and outgoing wiring.

Similarly, the central energy plant was manufactured as a fully modular system, comprising three 900-ton chillers, three chilled-water pumps, three condenser water pumps, filter system, and all the electrical components, controls and piping to support an entire chilled water system. After being assembled at an offsite factory, the plan was shipped to the construction site in four sections and simply dropped into place.

Curtainwall units also were engineered and assembled offsite, reducing the onsite labor and associated costs of installation. Through design-assist procurement, based on a target value for the design, the team was able to meet both the design and budgetary goals for the curtainwalls.

In addition, bathroom “pods” for the campus hotel were procured from a single source, rather than from an array of dozens of vendors and suppliers. Single-source procurement also reduced construction time and labor costs, because most of the bathroom pods were installed before the building was even topped out.

Given that bathrooms typically constitute 80% percent of hotel room buildout costs, the cost savings were significant. AlsoMoreover, important, the pods exceeded quality expectations because they were produced in a controlled manufacturing environment.

To further save time and reduce costs, the project team used Lean construction techniques and high-tech tools that also improved the accuracy of the design and construction drawings. For example, the team used cloud-based Autodesk BIM 360 Glue to accelerate planning and collaboration on iPads, and StructionSite for sharing progress documentation in the field. With Skycatch cloud-based software, the team combined images captured by drone into single images for construction review.

As interiors were constructed, the team used Never Miss technology to accelerate drywall finishing, and a PanelMax drywall fabrication machine that eliminated the need to apply beading on outward-facing drywall corners.

Built on innovation from the inside out, the new KPMG Lakehouse will offer the company’s 32,000 employees a place to be inspired, recharge, reconnect and refocus on new challenges and opportunities. When the campus opens in January 2020, clients and other companies will be able to send their employees for training, or to work with KPMG teams in an innovation lab to solve their toughest challenges. The center promises to set an example for how businesses can help prepare workers to adapt in a world where many of the jobs that will exist in 10 years haven’t been invented yet.

The articles from these contributors are based on their personal expertise and viewpoints, and do not necessarily reflect the opinions of their employers or affiliated organizations.

Read Also

Unlocking Construction Innovations with 4d Simulations

Unlocking Construction Innovations with 4d Simulations

Federico Pensa, Vice President of Technology, Fayolle Canada
Navigating the Future of Retail Construction

Navigating the Future of Retail Construction

Seamus Farnan, Vice President, Construction & Facilities - Store Development, Earls Kitchen + Bar
Building Success: How Metro’s Barrie Store Came to Life

Building Success: How Metro’s Barrie Store Came to Life

Alena Zinovieva, Senior Manager, Construction, Metro Inc.
Strategies for Successful Brownfield Construction and Risk Management

Strategies for Successful Brownfield Construction and Risk Management

Scott Dumville, Engineering Manager, The JNE Group of Companies
Raising the Standards of the Construction Sector

Raising the Standards of the Construction Sector

André Mylocopos, Senior Director Major Projects, CIMA+
Construction & MRO - Roofing Projects

Construction & MRO - Roofing Projects

Roy Sudipto, Global Capital, Construction and MRO Procurement Manager, Maple Leaf Foods
follow on linkedin follow on twitter Copyright © 2026 All Rights Reserved | by:

Construction Tech Review

| Subscribe | About us | Sitemap| Newsletter| Editorial Policy| Feedback Policy
Top